# Proposals
0
Portfolios calculated & versioned
# Projects
0
Across each proposal's latest version
Total MW
0
Summed portfolio size, latest versions
Proposals This Week
0
Created in the last 7 days
Proposals This Month
0
Created in the last 30 days

Saved Proposals History

Opportunity ID Opportunity Name Account Notes
Loading proposals...
Active Technicians
0
Geocoded & routed from DB
Active Sites
0
Approved contracts (BigQuery)
Pending Sites
0
Signed, not yet started (BigQuery)
Proposed Sites
0
Added for this proposal

Coverage Map & Distance Routing

Click on a technician or site marker to view details. ● Technician   ■ Active site   ■ Pending site   ■ Proposed site

Layers
Base Map
Drive-Time Radius

Estimated from real OSRM road routing in each direction, not a straight-line circle — still approximate, not a precise isochrone.

Customer Filter

Add Proposed Sites

Paste a site list (one per line — tab or comma separated: name, address) or drop a CSV/text file. Each row is geocoded and added as a proposed-site pin.

Drag & drop a CSV/TSV/text file here, or click to browse

Client, Portfolio and Project Details

Establish the client profile and opportunity parameters. Add portfolio projects further below manually, via Copper CRM, or from parsed engineering blueprints (Parse Drawing/Contract/Scope tab).

Sourcing Portal
Enter Opportunity ID 26-0011 for a mock Copper CRM data pull.
Reload a previously saved proposal into the wizard.
Populate the opportunity ID and site assets from a previously parsed drawing set.
Reprice a currently-active contract — populates the site's location and asset counts from BigQuery. Everything else is entered manually.

Portfolio Contract Parameters

Establish the global contract variables applied across every project in this portfolio.

i

Site Assets & Quantities Setup

Configure sizes, hardware counts, and localized on-site drive times. Pick a previously parsed drawing above a card, or upload a new one, to auto-fill it.

Portfolio Routing Map

Verify site locations relative to our current technician locations.

Pricing Summary/Ledger

Review calculated fees, total portfolio summaries, and detailed hours side-by-side. Updates live as parameters change.

Proposal Results & Export

Verify calculations, review the cover letter, save the active proposal version, and export styled PDF/PPTX documents.

Client & Contact Summary

Client Name:
Contact Name:
Contact Phone:
Contact Email:
Opportunity ID:
Proposal Name:

Portfolio & Projects Priced

Total Size
0.00 kW
Portfolio Grand Total
$0.00

Cover Letter & Proposal Commentary

Included as the cover letter on the generated proposal PDF. The opening and closing are pre-filled from Cleanleaf's standard letter — edit the middle to add deal-specific commentary. The recipient greeting and signature are generated automatically from the client contact and your account details.

Proposal Assumptions

Rendered under each package's pricing table on the generated PDF. Pre-filled from the standard set (Pricing Constants → Proposal Text Defaults) — edit here for anything project-specific without touching the shared defaults. One bullet per line; numbering is authored inline. Each block has a Reset button to restore the shared default.

Actions & Exporters

Active Proposal Revision History

Version Date Details of Changes
Calculate or load a proposal to see its version history.

Upload RFP PDF / SOW DOCX

Drag and drop RFP PDF or SOW DOCX here

or click to browse from your computer

Design Drawings & CAD Blueprint Parser

Upload engineering single-line drawings, site plans, or layout PDFs to automatically extract site coordinates, install types, and component counts. Each parsed drawing is saved under its own label so it can be selected later from the Site Assets section of the Proposal Wizard.

Drag and drop drawings or layouts here

Supports PDF, CAD, DXF, or DWG blueprints

Site List Spreadsheet Importer

Upload an Excel or CSV site list from a customer bid. Column headers are matched automatically; asset counts are inferred from the system size using the assumptions below.

Drop an .xlsx or .csv site list

or click to browse

Asset-count assumptions

Document Review Log

Click a CAD drawing row to view what was extracted in the panel below.

Type Document Opportunity / Project Reviewed At Reviewed By Result
No documents reviewed yet.

Extracted Details

Click a CAD drawing in the Document Review Log above to view what was extracted.

Active Pricebook Version

The version highlighted below is the one currently in effect. Pick another to review what was included in that release. Full history and cutting a new version live on the Feedback & Revisions tab.

Select a version above to view its release notes.

Hours → Price: Complete Pricing Stack

Cost-Price Summary Model

Every input applied on top of estimated labor hours to arrive at a quoted dollar price. The Preventive and Corrective stacks apply different overhead and margin targets.

# Cost Layer Preventive Corrective Description
Loading pricing stack...

Maintenance Hours Model

Preventive Maintenance

Per-Unit Hours × Config

Hours allocated per unit during annual preventive maintenance. Values vary by install type (Roof / Ground / Carport) and inverter type (Central / String). All assets also include a 0.50 hr fixed setup per asset category. The last four rows (Solar Array, BOP Walk Inspection, Tracker Motors, Weather Station) are size-driven formulas rather than fixed per-unit hours, so the same formula reads across every install/inverter column.

Asset Type Fixed Hrs Roof / Central Roof / String Ground / Central Ground / String Carport / Central Carport / String
Loading preventive hours matrix...

Corrective Maintenance

Annual Reactive Estimates

Estimated annual corrective maintenance visits and labor hours by equipment type and site configuration, driving the comprehensive O&M package budget. The BOS/BOP row (Transformer, Switchgear, Comm Cabinet, Weather Station, AC Panel) is an aggregate estimate, not per-unit — shown as one combined row, with its base value and per-configuration adjustment multiplier both broken out below.

Asset Type Roof / Central Roof / String Ground / Central Ground / String Carport / Central Carport / String
Loading corrective hours matrix...

How this rolls up: annual Comprehensive/Corrective hours and visits = (Inverter hours/visits × inverter count) + (Combiner hours/visits × combiner count) + the BOS/BOP row above (a flat per-site amount, not multiplied by unit count). That subtotal is then scaled by two blanket Comprehensive labor factors — ×2.0 for visits and ×1.5 for hours — which account for the real-world corrective labor overhead the per-unit matrix values alone understate. The scaled total flows through the same Labor → Travel → Off-Site/Management → Indirect Back Office → G&A/Sales Overhead → Margin stack as Preventive (see Hours → Price at the top of this page), just with Comprehensive's own percentages.

Corrective Visit (Included/Additional): each prepaid visit — whether from the portfolio's Corrective Visits Included or a site's own Additional Visits — is priced as round-trip drive time + an estimated visit duration (currently 90 min), × the wage rate. Flat, no margin/markup stacked on top, unlike the hours-based rows above.

Travel Hours & Drive Time Logic

How round-trip travel time is computed for each maintenance model, and where drive times are sourced from.

Wage Rates

Wage Rate Overrides

Custom-entered rates for portfolios with union CBAs or prevailing wage requirements not covered below. Multiple entries can exist per pricebook version — selectable per project on the Pricing Summary/Ledger step.

Label Base Rate Fringe Total Rate Entered By Date Notes
Loading overrides...

State Standard Wage Rates

Base hourly wage rate, fringe, and total (base + fringe) for the states we currently have technicians in. Fringe defaults to 30% of base and is stored per row so it can be overridden individually. Every prevailing-wage or CBA project is priced individually via a Wage Rate Override above instead of a standing county-by-county table. Click a column header to sort.

State Base Rate Fringe Total

Approx Licensed State Base Rate

Used when a project's state isn't in the table above. Shown in the pricing ledger with a "To Be Confirmed" note since it's an estimate, not a sourced rate.

$/hr

Additional / Ancillary Services

Priced separately from the hours-based stack — module washing, vegetation/mowing, aerial thermal inspections, specialized lift rental, and material/inventory storage — each with their own cost basis and markup.

Item Rate Basis Markup
Loading...

Aerial Thermal Scan — Rate Table

Below 2,000 kW: flat $750 base cost. At or above 2,000 kW: base cost = rate ($/MW) × system size (MW), using the highest threshold at or below the project's size. Either way, the base cost is then marked up 25% and multiplied by the requested quantity of scans.

System Size Threshold Rate ($/MW)
Loading...

Aerial Inspection Threshold

Used by "Project Size Dependent" in the wizard's String Testing/Aerial Inspection selector: projects below this size get String Testing, projects at or above it get Aerial Inspection.

kW

Minimum O&M Package Price

Per-site price floor for the core O&M package (Preventive base for the Preventive package; Preventive + Comprehensive base for the Comprehensive package). Aerial thermal, lift rental, washing, and vegetation are excluded from the floor check. When any site's O&M portion falls below this at the user-entered discretionary markup, the markup is auto-bumped just enough to hit the floor and the Step 3 card + PDF export both show a "Min Floor Applied +$X" badge.

$

Fixed & Recurring Costs i

Per-project fixed costs, not driven by labor hours. Applied regardless of site size.

Item Rate Basis
Loading...

Proposal Text Defaults

Default text pre-filled into new proposals in the wizard's Results & Export step, and the "Assumptions" disclaimer bullets shown on each proposal's Preventive, Washing, and Vegetation pages. Read-only here -- Cover Letter and Offer Summary are meant to be edited per-proposal in the wizard itself when generating a proposal.

Submit Feedback

Tabulated Feedback & Requests

All user-submitted requests, bug reports, and features are tabulated below.

Date User Type Priority Description Status
Loading feedback entries...

Pricing Model Version History

Every material change to the pricing model is snapshotted as a new version. Historical proposals stay pinned to whichever version was current when they were priced. Admins can delete a version to remove it from the history — historical proposals stamped to a deleted version keep the stamp as a plain string.

Version Effective Date Description Created By
Loading version history...

Access Control

Manage user roles and permissions. Admins can add/remove users and change roles.

Email Name Title Phone Role Actions
Loading access list...

User Profile Settings

Configure your proposal identity. These values appear on generated proposals as the signatory / prepared-by block.

No signature
No photo